Jobs completed to date (August 2007) include:-

m

Full repair and refurbishment of Talisman Highlander Electrical Distribution Box (in conjunction with J&S Marine)

m

Design of Shell UMC electrical intervention jumper

m

Supply of Controls Engineers and controls support to Chevron-Texaco

m

Extensive repairs and refurbishment of 7 off Highlander Control Modules, including electronic repairs and complete valve refurbishment

m

Extensive repairs and refurbishment of 8 off Agip Balmoral Control Modules, Including electronic repairs and complete valve refurbishment/replacement

m

Repairs to 4 of pressure sensors and 5 off temperature sensors for Talisman energy

m

Subsea Controls Reliability study for Texaco North Sea

m

Engineering Assistance to Coflexip with bid work and FEED proposal analysis

m

Engineering Assistance to Boreas Consultants with testing of pipeline liner vent R&D project

m

Engineering Assistance to BP with Nom Com Som project

m

Engineering and supply of MCS Simulator for BP Don Subsea Controls

m

Engineering for controls equipment for N.W. Highlander step out well

m

Modification, testing, flushing and offshore operation of work over control equipment for completion of two Veba Guillemot wells

m

Re-design of electrical distribution systems for Talisman Highlander & Petronella fields including new subsea electrical distribution boxes and installation & re-commissioning of systems

m

Engineering support for Technip on Centrica Bains Project

m

Engineering support for Centrica on Rose Project

m

Engineering support for CNR/Zenocean

m

Design and supply of new topsides computers and operator station for CNR Ninian Central SSESV control system

m

 Design and supply of new Master Control Station for Lyell Subsea System on    Ninian South (Delivery end 2004)

m

Design and delivery of new and refurbished Controls equipment for ENI SE Stirling Development

m

Design and supply of subsea quick vent facility for ENI

m

 Design and supply of Controls Equipment for Talisman Orion Tor Development (SCM,SCMMB, Jumpers, Static Umbilical, Topsides Modifications) - Installed Sept 2005

m

Design and supply of Controls Equipment for Talisman Orion Tor Development (SCM, SCMMB, Subsea Distribution Assembly, Jumpers, Static Umbilical, Topsides Modifications) - Installed April 2006

m

 

Design and supply of replacement Master Control Station for CNR Balmoral - Installed April 2006

m

 

Manufacture and supply of 15 replacement pressure sensors for CNR's Balmoral field.

m

 

Detailed design and controls supply for CNR's Lyell field extension

m

 

Detailed design and controls supply for Talisman's Galley tieback to Tartan platform (ongoing)

m

 

Supply of 20 replacement subsea sensors for Talisman's Highlander field (Ongoing)

m

 

Engineering and supply for Talisman's HS15 step out well on the Highlander Template

All the above work was completed on or ahead of time and within budgets.