repair and refurbishment of Talisman Highlander Electrical Distribution
Box (in
conjunction with J&S Marine) |
|
m
|
Design
of Shell UMC electrical intervention jumper
|
|
m
|
Supply
of Controls Engineers and controls support to Chevron-Texaco
|
|
m
|
Extensive
repairs and refurbishment of 7 off Highlander Control Modules, including
electronic repairs and complete valve refurbishment
|
|
m
|
Extensive
repairs and refurbishment of 8 off Agip Balmoral Control Modules,
Including electronic repairs and complete valve refurbishment/replacement
|
|
m
|
Repairs
to 4 of pressure sensors and 5 off temperature sensors for Talisman energy
|
|
m
|
Subsea
Controls Reliability study for Texaco North Sea
|
|
m
|
Engineering Assistance
to Coflexip with bid work and FEED proposal analysis
|
|
m
|
Engineering Assistance
to Boreas Consultants with testing of pipeline liner vent R&D project
|
|
m
|
Engineering Assistance
to BP with Nom Com Som project
|
|
m
|
Engineering
and supply of MCS Simulator for BP Don Subsea Controls
|
|
m
|
Engineering
for controls equipment for N.W. Highlander step out well
|
|
m
|
Modification,
testing, flushing and offshore operation of work over control equipment
for completion of two Veba Guillemot wells
|
|
m
|
Re-design
of electrical distribution systems for Talisman Highlander &
Petronella fields including new subsea electrical distribution boxes and
installation & re-commissioning of systems
|
|
m
|
Engineering
support for Technip on Centrica Bains Project
|
|
m
|
Engineering
support for Centrica on Rose Project
|
|
m
|
Engineering
support for CNR/Zenocean
|
|
m
|
Design
and supply of new topsides computers and operator station for CNR Ninian
Central SSESV control system
|
|
m |
Design
and supply of new Master Control Station for Lyell Subsea System on
Ninian South (Delivery end 2004) |
|
m |
Design and
delivery of new and refurbished Controls equipment for ENI SE Stirling
Development |
|
m |
Design and supply of subsea quick vent
facility for ENI |
|
m |
Design and supply of Controls Equipment for Talisman
Orion Tor Development (SCM,SCMMB, Jumpers, Static Umbilical, Topsides
Modifications) - Installed Sept 2005 |
|
m |
Design and supply of Controls Equipment for Talisman Orion Tor Development (SCM, SCMMB,
Subsea Distribution Assembly, Jumpers, Static Umbilical, Topsides
Modifications) - Installed April 2006 |
|
m |
Design and supply of replacement Master Control Station for CNR Balmoral -
Installed April 2006 |
|
m |
Manufacture and supply of 15 replacement pressure sensors for CNR's Balmoral
field. |
|
m |
Detailed design and controls supply for CNR's Lyell field extension |
|
m |
Detailed design and controls supply for Talisman's Galley tieback to Tartan
platform (ongoing) |
|
m |
Supply of 20 replacement subsea sensors for Talisman's Highlander field
(Ongoing) |
|
m |
Engineering and supply for Talisman's HS15 step out well on the Highlander
Template |