

|
RRC Controls Services Ltd |
|
Subsea Controls Systems that Work |
|
Home | About Us | Contact Us | Product List | Service List | Project List | Company News |
|
Home |
|
About Us |
|
Contact Us |
|
Product List |
|
Service List |
|
Project List |
|
Company News |
|
RRC has an extensive list of projects undertaken. Brief details are given below. All of this work was completed on or ahead of time and within budget. For more information on any of these items, please email sales@rrccontrols.com |
|
· Design and Supply a replacement Master Control Station for Talisman’s Highlander Field (ongoing) · Design and Supply of replacement Highlander EDB · Design and Supply of Controls Equipment for Endeavour's Rubie 2 well. · Design and Supply of Controls equipment for Talisman's Burghley development · Design and Supply of Intervention EDB and Jumpers for Chevron's Strathspey Field · Engineering and supply for Talisman's HS15 step out well on the Highlander Template · Supply of 20 replacement subsea sensors for Talisman's Highlander field · Detailed design and controls supply for Talisman's Galley tieback to Tartan platform · Detailed design and controls supply for CNR's Lyell field extension · Manufacture and supply of 15 replacement pressure sensors for CNR's Balmoral field. · Design and supply of replacement Master Control Station for CNR Balmoral - Installed April 2006 · Design and supply of Controls Equipment for Talisman Orion Tor Development (SCM, SCMMB, Subsea Distribution Assembly, Jumpers, Static Umbilical, Topsides Modifications) - Installed April 2006 · Design and supply of Controls Equipment for Talisman Orion Tor Development (SCM,SCMMB, Jumpers, Static Umbilical, Topsides Modifications) - Installed Sept 2005 · Design and supply of subsea quick vent facility for ENI · Design and delivery of new and refurbished Controls equipment for ENI SE Stirling Development · Design and supply of new Master Control Station for Lyell Subsea System on Ninian South (Delivery end 2004) · Design and supply of new topsides computers and operator station for CNR Ninian Central SSESV control system · Engineering support for CNR/Zenocean · Engineering support for Centrica on Rose Project · Engineering support for Technip on Centrica Bains Project · Re-design of electrical distribution systems for Talisman Highlander & Petronella fields including new subsea electrical distribution boxes and installation & re-commissioning of systems · Modification, testing, flushing and offshore operation of work over control equipment for completion of two Veba Guillemot wells · Engineering for controls equipment for N.W. Highlander step out well · Engineering and supply of MCS Simulator for BP Don Subsea Controls · Engineering Assistance to BP with Nom Com Som project · Engineering Assistance to Boreas Consultants with testing of pipeline liner vent R&D project · Engineering Assistance to Coflexip with bid work and FEED proposal analysis · Subsea Controls Reliability study for Texaco North Sea · Repairs to 4 off pressure sensors and 5 off temperature sensors for Talisman energy · Extensive repairs and refurbishment of 8 off Agip Balmoral Control Modules, including electronic repairs and complete valve refurbishment/replacement · Extensive repairs and refurbishment of 7 off Highlander Control Modules, including electronic repairs and complete valve refurbishment · Supply of Controls Engineers and controls support to Chevron-Texaco · Design of Shell UMC electrical intervention jumper · Full repair and refurbishment of Talisman Highlander Electrical Distribution Box (in conjunction with J&S Marine) |
|
Project List |




